Structures a written site report
Turns pasted free text into quantities, trades, manpower and delay reasons — extraction and structuring, never judgement.
A programme without a site record is a plan. With one, it becomes a measurement.
Last updated
Zepth Rx module
Every analysis in Zepth Rx gets sharper with evidence from the ground. The forecast learns your uncertainty from completed work, and learns it better from measured productivity. The disruption and trade-stacking signals are computed from manpower on site. The credibility grade on a recovery programme asks whether a duration cut is supported by the resource actually deployed. Earned value has no cost performance at all until somebody records what was spent.
Field Data is where that evidence enters. It is not a reporting module — it is the input side of every other module in the product. Daily reports and non-conformance records are captured or imported here, in Zepth Rx itself.
Where quantities are tracked, Zepth Rx compares progress inferred from installed quantity against the percent complete the contractor has reported in the programme — and can write the inferred figure back.
This is one of the few places a platform can catch optimistic progress reporting with arithmetic rather than argument. An activity reported 70% complete whose installed quantity says 45% is a discrepancy with a number attached.
Comparing a trade’s achieved rate in a disrupted period against its own rate in an undisrupted one is the most respected disruption method precisely because the comparison is internal. The trade is its own control, so the argument does not depend on an industry benchmark anyone can contest.
It only works if the undisrupted period was recorded while it was happening. That is the whole case for capturing quantities from day one, on a project where nobody yet believes there will be a dispute.
Where field data feeds an engine, the coverage is published: how many activities had quantities, how many had reports, how many observations resulted, and how many reports could not be matched. An unmatched report is reported as unmatched.
This matters more than it sounds. The absence of field evidence and the presence of no delay look identical in a result — only a coverage count tells them apart.
The instruments this module produces, drawn on illustrative data so the method reads clearly.
The programme assumed a crew. The site recorded what turned up.
Non-conformances cross-tabulated by trade and zone, so a concentration reads as a pattern rather than a list. Repeated non-conformance in one cell is a rework problem and usually a productivity problem too.
The trade is its own control. Comparing a trade’s achieved rate in a disrupted period against its own rate in an undisrupted one — which is why the method does not depend on an industry benchmark anyone can contest.
Disruption claims are won on productivity records and lost without them — and the undisrupted period has to have been recorded at the time.
Contemporaneous site records are the highest-grade evidence in a construction dispute, and their value depends almost entirely on having been captured contemporaneously.
Inferred progress catches optimistic reporting while it is still a discussion rather than a variance.
Quality hot-spots turn scattered non-conformances into a pattern you can act on before the rework lands on the critical path.
A filed record rather than a free-text log — auto-numbered, with shift, working hours, subcontractor, permit number, work area, and the weather a delay analysis will later need. Each carries manpower, work summary lines with quantity installed and its unit, materials, equipment, photographs and attachments.
Every engine reads only what has been published, so a half-finished report cannot leak into an analysis — a distinction enforced in the code rather than by convention.
As a report is filled in, the form resolves the chosen trade and location against the active schedule and warns when the combination would credit no activity — at the point of entry, while the person who knows the answer is still looking at the screen.
Enter directly, import from Excel or CSV with duplicate detection and location-alias resolution, or paste free text and let an extraction path structure it. The model extracts and structures; it never decides whose delay it was.
Severity, zone, trade and date, entered directly or imported — cross-tabulated by trade and zone so a concentration reads as a pattern rather than a list, and feeding rework days into the mined risk register.
Where quantities are recorded, weekly achieved rates are derived per trade — units installed per man-day. That underpins the measured-mile comparison of a trade’s rate in a disrupted period against its own rate in an undisrupted one.
Imported, or recorded as certified amounts against bill pay items through a payment-certificate round-trip. Installed quantity is split by quantity, not by money — and anything that cannot be attributed is reported, never dropped.
Directly, by Excel or CSV import, or by pasting free text for extraction. The work-front check warns at entry when a trade and location combination would credit no activity.
Engines read only published reports, so a draft cannot reach an analysis.
Free text is mapped to one of eleven fixed conditions. The model never indicates who is responsible.
Import actual cost, or run the payment-certificate round-trip — export a blank certificate, fill in certified amounts and installed quantities, import it back.
Productivity, measured mile, inferred progress, deployment against plan, and the mined risk register — each publishing its own coverage.
Turns pasted free text into quantities, trades, manpower and delay reasons — extraction and structuring, never judgement.
Maps “waiting on approval” to a fixed condition. The instruction is absolute: it must never indicate who is responsible.
Categorised conditions and rework days feed the mined risk register, and every mined driver arrives switched off until a person enables it.
The engineer’s judgment stays in charge; the AI removes the latency and the blind spots.
The daily-report register with date, zone and trade filters and the full report editor; the non-conformance register; and the cost-data screen with actual-cost import and the payment-certificate round-trip. Field data also surfaces as labour deployed and quality hot-spots, and as actual against planned progress sliceable by work breakdown, location or trade.
In Zepth Rx itself. They are captured or imported here — Rx is a standalone platform and does not read a site record from anywhere else.
No, and it is instructed never to indicate responsibility. It maps a free-text note to a fixed condition. Attribution is done by a deterministic ownership cascade, from rules a human wrote, with the reason stored.
Quantity installed, with its unit. Productivity, the measured mile and inferred progress all depend on it, and without it they report zero coverage rather than contributing.
No. Drafts are separated from published reports and every engine reads only what has been published — enforced in the code, not by convention.
Through the same bill-to-programme bridge that carries budget, by the same proportional rule. Installed quantity is split by quantity rather than by money, and anything that cannot be attributed is reported rather than dropped.