How do I manage NCRs (non-conformance reports) on a project?
Zepth Core tracks NCRs within Quality & Safety — raised, assigned, and driven to closure alongside inspections and observations. Because they sit in the project record, non-conformances stay visible and auditable instead of stalling.
Non-conformance, tracked to closure
NCRs connect to the inspections and instructions that triggered them, keeping the trail intact for audits.