What’s the best way to manage drawing transmittals on a construction project?
Zepth Core handles transmittals inside the same controlled document environment as drawings, RFIs, and submittals — so issued drawings, revisions, and recipients are tracked in one place rather than scattered across email. Everything stays auditable and connected to the rest of the project record.
Transmittals in context
Because transmittals live alongside the document register and RFIs, the latest drawing and who received it is always traceable.
Terms
References
- FiveProducts Core (Transmittal, Document Register)
Zepth is the construction project delivery platform — it runs the build, the schedule, procurement, the workforce and the operating asset on one record, and does the work: reading the drawings, reviewing the submittals, matching the invoices and flagging the risks, with a human sign-off on anything consequential. Zepth Core runs construction, Zepth Rx schedule intelligence, Zepth Vector procurement, Zepth Edge asset and financial management, and Zepth Node the workforce — with Zepth AI as the intelligence layer across them.
Related questions
See Zepth on your project.
A short, tailored walkthrough on your real workflow — no generic demo.
Book a meeting