AI construction management software — one platform

AI-powered construction management software.

Zepth is the construction project delivery platform that ends chaos.

Not a system of record. An AI construction ERP that works the project with your team.

Construction project management, procurement and asset management on one record — and AI that doesn’t just do the work, it owns getting it done.

  • Reviews in hours, not days
  • 94% first-pass review accuracy
  • Every finding cited, signed off by a human

Live

Review feed

RFIRFI-2026-0091 reviewed · MEP/structure conflict flagged73%
What it costs today

The margin leaked before anyone noticed.

Not bad engineering. Time spent chasing information, work done twice, and a date nobody could see slipping until it had.

Four separate leaks. Four different denominators.

Measured against different things, so they are shown separately rather than added up.

35%of the working week
working week = 100%

lost to chasing information, conflicts and rework

FMI research

5–9%of project cost
project cost = 100%

burned on rework

Industry studies

$60M+

the average US construction dispute

and over a year to resolve

Arcadis 2025

$1.85T

what bad data cost construction

in a single year, industry-wide

FMI research

The date you were given, and the odds on it
on time
late
late
late

1 in 4

projects came within 10% of their original deadline.

KPMG Global Construction Survey 2015 — owner survey over the prior three years. Eleven years old, and we say so rather than passing it off as current; we could find no more recent equivalent measurement, and KPMG’s later surveys publish no schedule-performance figure at all.

The old way vs the Zepth way

Every incumbent calls itself a system of record. That is a filing cabinet with a search box.

The old way

Software that stores your project.

The Zepth wayDELIVERY

A platform that delivers it.

Reviews done, responses drafted, risks flagged — work moving, not filed.

The old way ends here.

See it on your workflow
The new hire

Not a chatbot bolted on. A co-worker managing the whole process.

Ask any project team where the margin went and you get the same answer: unowned process. The submittal that sat eleven days in an inbox. The RFI nobody chased. The invoice paid against a quantity nobody matched.

Zepth staffs those processes. A co-worker manages each one end to end — planning closure the day work arrives, re-forecasting on every event, and dispatching the specialist agents that read the documents and test them against the specification. Their findings come back as one drafted output, with citations. It drafts everything and signs nothing.

Reviews submittals and RFIs in hours, not days.

Checked against your drawings, specs and contract.

SUB-2026-0142

approved · matches E-20196%

Drafts the RFI response before your engineer opens it.

Cited references and a confidence score. The engineer reviews and sends.

RFI-2026-0091

draft ready · 3 refs cited73%

Reads every bid line by line.

Vendor BOQs compared item by item, pricing anomalies flagged, recommendation drafted.

TND-2026-0014

6 bids compared · 2 anomalies94%

Matches invoice, delivery and order before you pay.

Every quantity and rate variance caught before the payment leaves.

INV-2026-0317

held · qty variance vs PO-008891%

Flags change-order and claim risk early.

The cost impact priced while there is still time to act on it.

CO-2026-0021

risk flagged · exposure priced84%

Answers questions about your project in plain language.

Asked in a sentence, answered with charts, from live project data.

ASK-2026-0203

answered · 4 sources cited92%

Review turnaround, before and after
Before5.2 daysOn Zepth1.7 daysZepth platform data — review turnaround on one record, not five tools

22%

of RFIs never get a formal answer at all — the industry baseline an owned process is measured against.

Cited on /modules/rfi/

You see how often it agrees with your engineers, discipline by discipline — and you decide what it is allowed to run on its own.

Meet your AI co-workers
Stop asking “are we on track?”

Predict the finish date. Then defend it.

Your critical path gives you one completion date and no idea how likely it is. Zepth runs your schedule thousands of times — with durations drawn from how your trades have actually performed on this project — and gives you the probability of every date, including the one in your contract.

The uncertainty is measured from your own completed work. Not an industry assumption, and not a planner’s optimistic and pessimistic guesses.

See how the forecast is built
One date, or the range the date actually sits in
P10P50P80P90your contract dateearlierlater

A single finish date tells you nothing about how likely it is. Two projects can share one and be nothing alike — the width of the band is the information the date cannot carry.

Schematic, showing what a probabilistic forecast looks like rather than any project’s result.

P10
the optimistic end
P50
as likely as not
P80
the planning figure
P90
the confident end
The platform

Five products. One way of working.

Construction, procurement, assets, workforce and the programme itself — from the first RFI to the operating asset.

The building lifecycle · one record

One record, not a stack of integrations.

One living record, from first drawing to end of life — so there is no truth to chase across a dozen disconnected tools.

01 · Design & construction

Documents, quality, the site and risk — one record instead of a hundred inboxes.

02 · Procurement

Plan, tender, award and pay — end to end, without the email bid chaos.

03 · Operations

Assets, CapEx, budgets and reporting — governed instead of guessed.

Point tools wired together, or products reading one record

A stack, integrated

Every tool owns a slice. The truth is whatever the last integration synced, and the answer to a simple question lives in four of them.

One record

recordCoreRxVectorEdgeNode

One place the project actually lives. The products read and write to it, so nothing has to be reconciled between them — and the AI acts on the record rather than a copy of it.

Schematic. The left-hand topology illustrates a stack of point tools; it is not a count of anyone’s systems, and no vendor is named.

On live projects

Running on live projects across the built environment.

ConstructionReal estateInfrastructureHospitality
100+

projects delivered

50M+

sq ft under management

AI-powered construction project management on site
High-rise construction managed with Zepth platform
Infrastructure construction project controls
How it works

From kickoff to go-live, in four steps.

An enterprise platform — modules and agents — live alongside the tools you already run. No rip-and-replace, no year-long rollout.

01

Project setup

Provision your workspace and connect the tools and data you already run. No rip-and-replace.

02

Configuration

Switch on the modules you need and map specs, contracts, templates, and approvals to your standards.

03

Training

Hands-on sessions get teams confident across modules and agent workflows — productive from day one.

04

Go live

Teams work across the platform while built-in agents review in real time — with human sign-off on anything consequential.

See Zepth on your project.

A short, tailored walkthrough on your real workflow — RFIs, procurement, or asset data. No generic demo.

Book a meeting

No list prices, and never charged on your construction volume. See how pricing works